As-Built Drawings Approval in Dubai

Dubai Engineering Approvals handles as-built drawings approval in Dubai, from document preparation to final sign-off.

Get a same-week response

What can we help with?

So the right person reviews your request.

Where is the project?

So we know where the work is.

Tell us about the project

Anything that helps us understand the scope of the work.

Who should we contact?

Name so we know who to ask for; phone so we can reach you fast.

Where do we send the quote?

Where we send our reply. We never share it.

We use these details to reply to your request. Privacy Policy

We reply within one business day with the exact document list.

  • Site survey coordination
  • Drawing set reconciliation
  • Authority submission
What As-Built Drawings Approval covers

Dubai Municipality (or the relevant free zone authority)

What As-Built Drawings Approval covers

As-built drawings record what was actually constructed, which must match your approved building permit drawings before a Building Completion Certificate can be issued. Preparing and submitting as-built drawings typically costs AED 2,500-15,000, in line with other engineering drawing services. We survey the completed structure, update the drawing set to reflect any changes made during construction, and submit the as-built package to the authority ahead of your completion certificate inspection.

Why work with us on as-built drawings approval

  • Accurate site survey

    We measure the completed structure directly rather than assuming it matches the original drawings.

  • Reconciled drawing sets

    Every deviation from the approved plans is documented and reflected in the updated as-built set.

  • Feeds straight into your BCC

    As-built approval is the step immediately before your Building Completion Certificate inspection - we sequence both together.

Our Process

How as-built drawings approval works

  1. Site survey

    We measure and document the completed structure as built.

  2. Drawing reconciliation

    The original approved drawings are updated to reflect any on-site changes.

  3. Submission

    The as-built package is filed with the authority.

  4. Approval

    Once accepted, the property is ready for its Building Completion Certificate inspection.

What we prepare and file for as-built drawings approval

Documentation

What we prepare and file for as-built drawings approval

An as-built drawings approval submission is only as fast as its weakest document. Depending on scope, we assemble the architectural, structural, and MEP drawings Dubai Municipality (or the relevant free zone authority) needs to review, plus any supporting NOCs, ownership documents, or trade licences the application requires. Each submission is checked against the authority's current document list before it's filed, and we respond directly to any query the reviewer raises rather than passing it back to you to interpret.

As-Built Drawings Approval cost & timeline

  • Typical cost range

    AED 2,500-15,000 depending on how much the finished structure deviates from the originally approved drawings and the size of the property.

  • Typical turnaround

    A property built exactly to its approved drawings needs minimal as-built revision; one with on-site changes takes longer to survey and redraw accurately.

  • Reviewing authority

    Dubai Municipality (or the relevant free zone authority) reviews and issues this approval.

As-Built Drawings Approval - common questions

What are as-built drawings?

They are updated drawings showing exactly what was constructed, including any changes made on site from the originally approved building permit drawings.

Do I need as-built drawings if nothing changed during construction?

A property built exactly to its approved drawings needs a lighter-touch confirmation than one with on-site changes, but a formal as-built record is still generally required before the completion certificate stage.

How does this relate to my Building Completion Certificate?

As-built approval confirms the record is accurate before Dubai Municipality's final inspection for the BCC - the two steps are usually sequenced back to back.